Skip to content
FY2026 GAA: ₱6.79T
PisoScan

TOPNOTCH CATALYST BUILDERS INC.

Contractor c2ee1fdf342183b98220

Overview

PhilGEPS awards
₱11.34B · 248 awards
DPWH contracts
₱8.64B · 180 contracts
Rank by recorded value
#147 of 23,487

More info

First record
Mar 18, 2016 (10 yrs 7 mo ago)
Latest record
Dec 8, 2025 (11 mos ago)
DPWH contractor code
34061

Where they work

Latest 25 from a total of 180 DPWH contracts
Contract IDStartDescriptionStatusOfficeAmount
25CC03101 yr 5 mo agoCONSTRUCTION OF REINFORCED CONCRETE RIVER PROTECTION STRUCTURES ALONG ANGAT RIVER BARANGAY SIPAT PUROK 5, PLARIDEL, BULACAN (PACKAGE A)Flood Control and DrainageOn-GoingBulacan 1st DEO₱71.3M
25CC04121 yr 5 mo agoCONSTRUCTION OF REINFORCED CONCRETE RIVER PROTECTION STRUCTURES ALONG ANGAT RIVER AT BARANGAY PALTAO, PULILAN, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱47.5M
25CC04671 yr 5 mo agoCONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BAKA-BAKAHAN, PANDI, BULACANBuildings and FacilitiesOn-GoingBulacan 1st DEO₱14.5M
25OB03421 yr 5 mo agoCONSTRUCTION OF MULTI LEVEL PURPOSE BUILDING, PACKAGE 2, BARANGAY HARAPIN ANG BUKAS, MANDALUYONG CITYGAA 2025 SSPCompletedMetro Manila 1st DEO₱19.4M
25OG00961 yr 7 mo agoREHABILITATION OF ROAD, BARANGAY BLUE RIDGE A, PHASE 2, QUEZON CITYRoadsOn-GoingQuezon City 2nd DEO₱94.5M
25OG00971 yr 7 mo agoREHABILITATION OF ROAD, BARANGAY SAN ROQUE, QUEZON CITYGAA 2025 SSPOn-GoingQuezon City 2nd DEO₱94.5M
25OG01121 yr 7 mo agoREHABILITATION OF ROAD, BARANGAY MASAGANA, PACKAGE 2, QUEZON CITYRoadsCompletedQuezon City 2nd DEO₱19.2M
25OD01321 yr 7 mo agoCONSTRUCTION OF FLOOD CONTROL WALL ALONG CANUMAY CREEK (PHASE 3) BARANGAY CANUMAY WEST, VALENZUELA CITYGAA 2025 SSPCompletedMetro Manila 3rd DEO₱97.2M
24CC06651 yr 8 mo agoCONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, BARANGAY MANATAL (PUROK 3 TO PUROK 5), PANDI, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱46.5M
24CB01381 yr 8 mo agoCONSTRUCTION OF FLOOD CONTROL DIKE AT TANATO, BALANGA CITY, BATAANFlood Control and DrainageOn-GoingBataan 2nd DEO₱94.3M
24CB01391 yr 8 mo agoCONSTRUCTION OF FLOOD CONTROL DIKE AT NABASAG RIVER (PHASE 1), PILAR, BATAANUnprogrammed Appropriations 2024On-GoingBataan 2nd DEO₱141.5M
25CC00781 yr 8 mo agoCONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE A) AT BARANGAY MANATAL (PUROK 3), PANDI, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱74.1M
25CC00791 yr 8 mo agoCONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE B) AT BARANGAY MANATAL (PUROK 3), PANDI, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱74.1M
25CC00881 yr 8 mo agoCONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE B) AT BARANGAY BUNSURAN (PUROK 3), PANDI, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱74.1M
25CC00901 yr 8 mo agoCONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY BAGBAGUIN (PUROK 5), PANDI, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱74.1M
25CC01091 yr 8 mo agoCONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY POBLACION, BUSTOS, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱74.1M
25CC01111 yr 8 mo agoCONSTRUCTON OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY CULIANIN (PUROK 3), PLARIDEL, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱77.2M
25CC01121 yr 8 mo agoCONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE A) AT BARANGAY CULIANIN (PUROK 4), PLARIDEL, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱74.1M
25CC01131 yr 8 mo agoCONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE B) AT BARANGAY CULIANIN (PUROK 4), PLARIDEL, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱74.1M
25CC01311 yr 8 mo agoCONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE B) AT BARANGAY SAN JOSE (SITIO SANTAN), PLARIDEL, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱69.5M
25CC01481 yr 8 mo agoCONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE (PACKAGE B) AT BARANGAY BAGONG SILANG (PUROK 4), PLARIDEL, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱69.5M
25CC01491 yr 8 mo agoCONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY SAN JOSE (PUROK 3), PLARIDEL, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱77.2M
24CC06431 yr 8 mo agoCONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY PRITIL (KABILANG BAKOOD TO PUROK 4) GUIGUINTO, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱70.4M
24CC05761 yr 10 mo agoCONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE D, BARANGAY TANAWAN, BUSTOS, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱92.7M
24CC05771 yr 10 mo agoCONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE E, BARANGAY TANAWAN, BUSTOS, BULACANFlood Control and DrainageOn-GoingBulacan 1st DEO₱92.7M

Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.