San Miguel
Region III (Central Luzon) ›Bulacan › City / municipality · PSGC 0301421000
Contract awards located here
14
₱35.4M listed value · PhilGEPS
DPWH contracts located here
451
₱16.95B contract value
COA audit opinion
qualifiedCY2024
COA executive summary 451 DPWH contracts
| Contract ID | Start | Description | Status | Office | Contractor | Amount |
|---|---|---|---|---|---|---|
| 25CP0140 | 1 yr 3 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. BASIC INFRA. PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD CONTROL STRUCT, SAN MIGUEL RIVER, BRGY. LABNE,SAN MIGUEL, BULACAN, PACKAGE 12Flood Control and Drainage | On-Going | Bulacan 3rd DEO | FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO | ₱97.4M |
| 25CP0043 | 1 yr 4 mo ago | FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF BUGA-SALACOT CONCRETE SLOPE PROTECTION ALONG BULO RIVER SECTION, SAN MIGUEL,BULACAN (UPSTREAM DIKE,PACKAGE 1)Flood Control and Drainage | On-Going | Bulacan 3rd DEO | FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO | ₱47.5M |
| 25CP0052 | 1 yr 4 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239- SOLAR STREET LIGHTS INSTALLATION AND APPLICATION, SIBUL- BIAK NA BATO ROAD SECTION, SAN MIGUEL, BULACANRoads | On-Going | Bulacan 3rd DEO | ADSL CONSTRUCTION & TRADING | ₱95.1M |
| 25CP0133 | 1 yr 4 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG. (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - REHAB. OF SIBUL - DRT ROAD, DONA REMEDIOS TRINIDAD, BULACAN (PHASE 2)GAA 2025 SSP | On-Going | Bulacan 3rd DEO | CORE CHECK CONSTRUCTION INC. (59155) / ONE FRAME CONSTRUCTION INC. | ₱97.6M |
| 25CP0139 | 1 yr 4 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRA. PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRAT. PUBLIC BUILDINGS/FACILITIES - CONST. OF CONCRETE FLOOD CONTROL STRUCTURE, SAN MIGUEL RIVER, BRGY LABNE, SAN MIGUEL, BULACAN,PACKAGE 11Flood Control and Drainage | On-Going | Bulacan 3rd DEO | FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO | ₱97.5M |
| 25CP0145 | 1 yr 4 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA.PROG. (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES - CONST. OF FLOOD CONTROL STRUCTS,. SAN MIGUEL RIVER, BRGY. LABNE, SAN MIGUEL, BULACAN, (PACKAGE 13)GAA 2025 SSP | On-Going | Bulacan 3rd DEO | FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO | ₱97.5M |
| 25CP0149 | 1 yr 4 mo ago | BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CONCRETE SLOPE PROTECTION INCL. IMPROVEMENT OF WATERWAYS ALONG TARTARO SECTION, SAN MIGUEL, BULACAN (PHASE 6)GAA 2025 SSP | On-Going | Bulacan 3rd DEO | CORE CHECK CONSTRUCTION INC. (59155) / ONE FRAME CONSTRUCTION INC. | ₱97.4M |
| 25CP0154 | 1 yr 4 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. -BASIC INFRA. PROG. (BIP) - BIP -FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONSTRUCTION OF CONCRETE SLOPE PROTECTION INCL. IMPROVEMENT OF WATERWAYS ALONG TARTARO SECTION, SAN MIGUELGAA 2025 SSP | On-Going | Bulacan 3rd DEO | CORE CHECK CONSTRUCTION INC. (59155) / ONE FRAME CONSTRUCTION INC. | ₱48.8M |
| 24C00113 | 1 yr 4 mo ago | BASIC INFRASTRUCTURE PROGRAM - BIP - EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES-CONSTRUCTION OF SAN MIGUEL DISTRICT HOSPITAL(PHASE IV),BARANGAY SANTA RITA MATANDA, SAN MIGUEL, BULACANBuildings and Facilities | On-Going | Region III | EIRISH BUILDERS & SUPPLY INC. | ₱29.3M |
| 25CP0001 | 1 yr 4 mo ago | ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 1, SAN MIGUEL, BULACANGAA 2025 OO-1 | On-Going | Bulacan 3rd DEO | ADSL CONSTRUCTION & TRADING | ₱133.7M |
| 25CP0002 | 1 yr 4 mo ago | ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 2, SAN MIGUEL, BULACANGAA 2025 OO-1 | On-Going | Bulacan 3rd DEO | ADSL CONSTRUCTION & TRADING | ₱133.7M |
| 25CP0051 | 1 yr 4 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239- SOLAR STREET LIGHTS INSTALLATION AND APPLICATION, STA. RITA-CAMIAS OLD ROAD SECTION, SAN MIGUEL, BULACANRoads | On-Going | Bulacan 3rd DEO | ADSL CONSTRUCTION & TRADING | ₱95.2M |
| 25CP0041 | 1 yr 5 mo ago | FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SALACOT - ILOG BULO CONCRETE SLOPE PROTECTION ALONG BULO RIVER SECTION, SAN MIGUEL, BULACAN (UPSTREAM DIKE, PACKAGE 1)Flood Control and Drainage | On-Going | Bulacan 3rd DEO | FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO | ₱47.5M |
| 25CP0042 | 1 yr 5 mo ago | FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SALACOT - ILOG BULO CONCRETE SLOPE PROTECTION ALONG BULO RIVER SECTION, SAN MIGUEL, BULACAN (UPSTREAM DIKE, PACKAGE 2)Flood Control and Drainage | On-Going | Bulacan 3rd DEO | FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO | ₱47.5M |
| 25CP0086 | 1 yr 5 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS/ FACILITIES - CONST. OF ROAD OF STA. LUCIA TO LAMBAKIN, BARANGAY .GAA 2025 SSP | On-Going | Bulacan 3rd DEO | EIRISH BUILDERS & SUPPLY INC. | ₱47.6M |
| 25CP0126 | 1 yr 5 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM(BIP)-BIP ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD BARANGAY CALUMPANG, SAN MIGUEL, BULACANRoads | On-Going | Bulacan 3rd DEO | 3AMR CONSTRUCTION SERVICES INC.(FORMERLY: 3AMR CONSTRUCTION SERVICES) | ₱19.0M |
| 25CP0137 | 1 yr 5 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRA.PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST. OF FLOOD CONTROL STRUCTURES ALONG MAASIM RIVER,BRGY. UPIG, SAN ILDEFONSO, BULACAN (UPSTREAM)Flood Control and Drainage | On-Going | Bulacan 3rd DEO | SELPHAR CONSTRUCTION | ₱97.6M |
| 25CP0181 | 1 yr 5 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BUGA, SAN MIGUEL, BULACANBuildings and Facilities | On-Going | Bulacan 3rd DEO | 3AMR CONSTRUCTION SERVICES INC.(FORMERLY: 3AMR CONSTRUCTION SERVICES) | ₱9.7M |
| 25CP0125 | 1 yr 7 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, BARANGAY BANTOG, SAN MIGUEL, BULACANRoads | On-Going | Bulacan 3rd DEO | 3AMR CONSTRUCTION SERVICES INC.(FORMERLY: 3AMR CONSTRUCTION SERVICES) | ₱19.5M |
| 25CP0150 | 1 yr 7 mo ago | CONVERG. AND SPECIAL SUPPORT PROG.-BASIC-INFRA. PROG.-BIP-FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF SLOPE REVETMENT STRUCT. WITH IMPROVEMENT OF WATERWAYS ALONG BALAONG RIVER CTRL., BALAONG-MASALIPIT BR. SECTIONGAA 2025 SSP | On-Going | Bulacan 3rd DEO | CORE CHECK CONSTRUCTION INC. (59155) / TOPNOTCH CATALYST BUILDERS INC. | ₱99.0M |
| 25CP0152 | 1 yr 7 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/STRAT. PUBLIC BLDGS./FACILITIES - CONST. OF SLOPE REVET. STRUCT. WITH IMPROVEMENT OF WATERWAYS ALONG BALAONG RIVER CONTROL BALAONG - MASALIPIGAA 2025 SSP | On-Going | Bulacan 3rd DEO | CORE CHECK CONSTRUCTION INC. (59155) / TOPNOTCH CATALYST BUILDERS INC. | ₱97.6M |
| 25CP0153 | 1 yr 7 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRA. PROG (BIP) - BIP - FLOOD MITIGATION STRUCTS. PROTECTING MAJOR/STRAT. PUBLIC BLDGS./FACILITIES - CONST. OF SLOPE REVET. STRUCT. WITH IMPROVEMENT OF WATERWAYS ALONG BALAONG RIVER CONTROL BALAONG - MASALIPIGAA 2025 SSP | On-Going | Bulacan 3rd DEO | CORE CHECK CONSTRUCTION INC. (59155) / TOPNOTCH CATALYST BUILDERS INC. | ₱99.0M |
| 25CP0045 | 1 yr 7 mo ago | FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT PROTECTION ALONG BULO RIVER, PUROK 1, BARANGAY MALIBAY, SAN MIGUEL, BULACANGAA 2025 OO-2 | Completed | Bulacan 3rd DEO | ADSL CONSTRUCTION & TRADING | ₱72.4M |
| 25CP0110 | 1 yr 7 mo ago | CONVERGE. AND SPECIAL SUPPORT PROG. - BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY BICLAT, SAN MIGUEL, BULACANRoads | On-Going | Bulacan 3rd DEO | 1199S CONSTRUCTION | ₱9.8M |
| 25CP0011 | 1 yr 7 mo ago | ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - RD TO PA CAMP - (S01419LZ) CHAINAGE 000 - CHIANAGE 454Roads | On-Going | Bulacan 3rd DEO | DRAKEN CRUZ CONSTRUCTION | ₱9.0M |
Records are placed by the location the source gives. Some national-level awards and DPWH contracts have no location and are not counted here.