Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 22CE0057

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","22CE0057","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALAVERA RIVER, BRGY. GOMEZ, LLANERA, NUEVA ECIJA","Flood Control and Drainage","Completed",49000000,0,100,"Nueva Ecija 1st DEO","Region III","IRC CONSTRUCTION & SUPPLIES (29943) / SYMMETRICON BUILDERS CORP. (37555)","2022-02-18","2022-09-15",2022,"Regular Infra - GAA 2022 OO-2",15.68633,120.99631,"304915000","304900000"]
SHA-256
1391c9bff55dcbe54d514741de78b7c596643752890055827b741e0d35bf462c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.