Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23E00042

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23E00042","SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG MAG-ASAWANG TUBIG RIVER, SITIO 3 & 4, BRGY. SAN ANDRES SECTION, NAUJAN, OR. MINDO","GAA 2023 CSSP","Completed",217121051.43,0,100,"MIMAROPA Region","MIMAROPA Region","NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)","2023-02-11","2024-02-05",2023,"Regular Infra - GAA 2023 CSSP",13.14206,121.16748,"1705208000","1705200000"]
SHA-256
dad189cb1227633f5d391f56e06fe3bd1cf4f377bdd8f05be6809dd3789c4f61

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.