Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23OB0383

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23OB0383","CONSTRUCTION OF MULTI-PURPOSE BUILDING (RFU-NCR MEGA LABORATORY BUILDING) (WITH EQUIPMENT), 1ST QUADRANT OF CAMP BAGONG DIWA ALONG GEN. SANTOS AVE., BICUTAN, TAGUIG CITY","Buildings and Facilities","Completed",81188147.02,0,100,"Metro Manila 1st DEO","National Capital Region","A.M. ORETA & CO., INC. (108)","2023-12-28","2024-10-22",2023,"Regular Infra - GAA 2023 CSSP",null,null,null,null]
SHA-256
03d02b50e596d903e14c9f2ecd1a355648169cf2ec730ccc186658f8e7ce550f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.