FY2026 GAA: ₱6.79T
PisoScan

Project 24M00006

DPWH infrastructure contract
Contract ID:
24M00006
Fingerprint:
20161d00f2f644…27226c63a7 Verified
Status:
On-Going
Physical progress:
100%
Timeline:
Start Sep 17, 2024 (2 yrs 1 mo ago)
Description:
WIDENING OF BRIDGE - LUMAYONG PARALLEL BR. ALONG BUKIDNON-COTABATO RD (PHASE II), K1652+371 - K1652+555.7, KABACAN, NORTH COTABATO
Category:
Bridges: Retrofitting - Concrete (Superstructure) - without Piles, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Traffic Engineering and Management System (including Road Safety Devices)
Implementing office:
DPWH Region XII · Region XII
Contractor:
Contract amount:
₱136,983,286.64 (₱137.0M)
Funding source:
Regular Infra - Bridges: Retrofitting - Concrete (Superstructure) - without Piles, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Traffic Engineering and Management System (including Road Safety Devices)
Budget year:
2024

Other DPWH contracts in the same city / municipality

View all
ContractStartDescriptionStatusAmount
26MI0069Jun 18, 2026SAYRE ROAD-SITIO TAWAGON-KILAMBAY, BRGY. KIBUDTUNGAN CONNECTING TO SALAMA, BANISILAN ROAD IN SUPPORT OF THE COCONUT PROCESSING INDUSTRY (TREE LIFE ORGANIC COCO SUGAR) - STA. 11 + 523.87 - STA. 11 + 751.37, CARMEN, COTABATOCompleted₱9.2M
26MI0071Jun 18, 2026ASPHALT OVERLAY ALONG DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) - K1646 + 239 - K1646 + 850Completed₱43.0M
26MI0001Jun 17, 2026(RE-BID) ASPHALT OVERLAY ALONG DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) - K1649 + 670 - K1649 + 1000Completed₱19.8M
25MI0092Aug 19, 2025CONSTRUCTION OF ROAD, MALANDUAGE-DAGUPAN SECTION, KABACAN, COTABATOOn-Going₱46.5M
25MI0080Jul 29, 2025CONSTRUCTION OF MULTI-PURPOSE BUILDING, USM-KABACAN IN KABACAN, COTABATOCompleted₱4.7M
25MI0087Jul 29, 2025CONSTRUCTION OF ROAD, PISAN, KABACAN, COTABATOCompleted₱46.5M
25M00006Jul 9, 2025CONSTRUCTION OF PULANGI RIVERBANK PROTECTION (DOWNSTREAM OF CARMEN BR., RIGHT BANK), PHASE II, STA. 0+000 - STA. 0+652.5, BARANGAY UGALINGAN, CARMEN, COTABATOOn-Going₱167.2M
25M00005Jul 7, 2025CONSTRUCTION OF KABACAN RIVER FLOOD CONTROL PROJECT (RUBBER TESTING CENTER), STA. 0+000 - STA. 0+648, BARANGAY POBLACION, KABACAN, COTABATOOn-Going₱157.7M